LOONAR

The AI platform for industrial commercial teams.

AI agents that analyse large RFQs, your customer's T&Cs and identify deviations for you Request access

Three ways Loonar compounds your commercial advantage.

01

Pursue more opportunities without adding headcount.

02

Your commercial and technical know how is centralized.

03

Fully transparent and auditable AI analysis.

The modules.

Loonar is built as a set of modules, one per step of your commercial process.
Each does one job and returns one reviewable deliverable.

Product preview
Tech params · Floating ball valve Live
5 Items 13 Parameters 4 Sources 4 Contradictions 2 Missing
Per-item parameters
46-BV-0210 2" (DN50) p.1 ANSI300 p.1 ASTM A216 WCB p.1 true · NACE MR0103 p.1 +2 more ↓
46-BV-0211 1" (DN25) p.1 ANSI300 p.1 +1 ASTM A182 F316 p.1 true · NACE MR0103 p.1 +2 more ↓
46-BV-0212 1.1/2" (DN40) p.2 ANSI150 p.2 316 SS / PTFE p.2 n/a p.2
46-BV-0213 3/4" (DN20) p.3 ANSI150 p.3 ASTM A216 WCB p.3 n/a p.3
13 parameters across 5 items · every value cited to its page · 4 contradictions, 2 missing
Technical deviations Live
6 Full deviation 14 Partial deviation 9 Missing info 18 Compliant
Pressure class Class 10000 All 12 gate valves Not catalogued at this class Product catalogue, gate valve range Full deviation Cannot be done Costs extra
Gate valve design API STD 600, bolted bonnet All 12 gate valves Designed to API 6D, not API 600 Product catalogue, gate valve range Full deviation Cannot be done Costs extra
Cryogenic compliance ISO 28921-1/2, low-temperature service Whole scope Not type tested to ISO 28921 Type test register, p.1 Partial deviation
Hazardous area rating Ex dc Zone 2 IIA T3, IP56 minimum Whole scope Nothing on file no evidence in the content library Missing info
47 requirements checked · 6 cannot be done · 14 cost extra · 9 with no evidence either way
Clause by clause against your standard positions Live
Aligned 1 Partial Deviation 5 Full Deviation 4 Additional Clause 4
Clause Client clause Status Assessment & proposed rewording
9. Liability and Insurance High risk

Aggregate liability capped at order value; consequential damages waived except for personal injury and IP/confidentiality breach.

Partial Deviation

Caps aggregate liability at order value rather than fees paid in the preceding 12 months, and lifts IP and personal injury out of the cap.

Assessed against your standard terms · Liability and IP · p.12

Proposed rewording

Original clause unconfirmed

Aggregate liability shall be limited to the order valuefees paid in the twelve (12) months preceding the claim.

13. Compliance and Ethics High risk

Supplier must comply with anti-bribery, sanctions, export control, environmental and HSE laws, and the client's Code of Conduct.

Partial Deviation

Imposes a unilateral compliance obligation on the Supplier only, omitting the mutual trade-control covenants.

Assessed against your standard terms · Compliance · pp.9–10

Proposed rewording

Original clause unconfirmed

The SupplierEach Party shall comply with all applicable anti-bribery, sanctions and export-control laws.

14 clauses assessed · 10 flagged high or medium risk
Valves_Purchase_Specification.pdf Live
6 Risks 6 Docs read 4 Non-standard 2 No record
PURCHASE SPECIFICATION Rev: 0 Date: 2026-06-18
SHUT-OFF & MANUAL VALVES Page 2 of 3

2. Scope of Supply

3. Nameplates

4. Inspection, Testing, Painting & Preparation for Shipment

Materials shall be preserved and packed to ensure suitability for a minimum storage period of 24 months at site.

Risks found 6 5 / 6 Next risk → Next doc →

Showing only requirements that deviate or conflict with another source. Clean sections do not appear here.

Unconfirmed API Monogram Licences No track record p3

The RFQ demands compliance with API 600, 602, 594 and 608, for which no monogram licence is on file.

Proprietary Project Specifications Non-standard p3

Multiple customer-proprietary specifications are mandated, requiring technical review and a possible cost adjustment.

Extended Preservation Requirement Non-standard p2

Preservation and packing must support 24 months of site storage, exceeding standard commercial practice.

Undefined Commercial Terms Non-standard p3

The RFQ references General Terms and Conditions that are not on file for this product range.

Hazardous Area Marking Requirement No track record p2

NEC Class I, Division 2 / IEC Zone 2 marking is specified, which is not standard for this valve range.

7 of 7 included in RFQ Analysis Run RFQ Analysis →
Your offer checked against the client's spec Live
11 Differ 8 Need a decision 3 Decided 3 Couldn't check

Needs your decision

8 every one cited to both documents
Minimum casing width ≥ 1000 mm 200 mm Decide

Casing width is 800 mm under the required minimum critical

IES-04-BC-001 ×4 RFQ p.12 · Offer p.4

Material certification EN 10204 3.2 EN 10204 3.1 Decide

Material certification is one grade below the requirement critical

IES-04-AD-001 ×2 RFQ p.22 · Offer p.8

Maximum airflow · summer duty 300 m³/h 248.4 m³/h Decide

Airflow is 17% below the requested duty

DS-4578-0001 ×63 RFQ p.7 · Offer p.4

Fire rating EI 120 / EN 1366-2 not stated Decide

Fire rating is not addressed anywhere in the offer to double-check

IES-04-BC-001 ×4 RFQ p.20 · Offer –

Show 4 more

Decided

3
Blade material is 304 rather than the specified 316L IES-04-BC-001 ×4 Accepted as exception
Free area is 7 points below the required minimum DS-4578-0001 ×63 Reprice
Position switch offered but not requested IES-04-BC-001 ×4 Ask the client

We couldn't check

3 a gap in our analysis, not in your offer
138 compared across 14 items · 3 not checked

Loonar reads the entire RFQ, and extracts every requirement you need to build a quotation, reconnecting it to the document and page where it came from.

Commercial impact

The measurable edge for industrial commercial teams

Industrial commercial teams lose weeks to RFQs and technical documents that have to be read line by line. The teams that adopt AI first are already pulling ahead.

These figures come from real RFQs run through Loonar for our first clients, not a projection.

10 min to analyze a 500+ page RFQ end to end, from upload to a full requirement list.
5000+ pages of RFQs and tenders Loonar has read and structured to date.
0 important requirements missed, every one tracked and cited back to its page.

The work behind every large RFQ gets our full attention. Yours can go to the decisions that move the business.

Gianlorenzo Gai
Gianlorenzo Gai Co-founder & CEO
Matteo Giardini
Matteo Giardini Co-founder & CPO

The work is the promise. You build on top of it, we make sure it holds. A page reference on every value, a citation behind every assessment, a queue for every contradiction.

Your process, not ours. Loonar fits inside the commercial process your sales team already owns, one module at a time. Each module is built out of how you already sell.

AI hand in hand with people. We build AI that completes your team, not one that replaces its judgment. Each module works in a narrow, precise way, so your engineers can use it exactly where it belongs and stay the ones making the calls.

Modern minimalist office

Security

Read more
  1. Zero Data Retention with our AI providers

    The AI model providers we use operate under Zero Data Retention terms: prompts and outputs are processed to generate the response and then discarded, never kept by the provider.

  2. No AI training on customer data

    Our customers' data belongs to them and is never used to train AI models.

  3. Flexible hosting

    Deployment adapts to your governance requirements, for example, deploy inside your own cloud environment.

  4. EU data residency by default

    Customer data is stored and processed exclusively in EU regions, in compliance with GDPR.

  5. Tenant isolation

    Your data and AI outputs never leave your tenant and are never shared with other customers or third parties.

  6. Certified foundations

    Loonar runs on certified infrastructure, Google Cloud and AWS (ISO 27001, SOC 2, EU-U.S. DPF).

Reading RFQ documents was never your team’s job. Winning them is.